How to feed aggregates?
It can feed aggregates by skip hopper or by belt conveyor.The small plant,like 25 m3/h,35 m3/h,and 50 m3/h,feeds aggregates by skip hopper.The big plant,whose capacity is higher than 60 m3/h, feed aggregates by belt conveyor.
It can feed aggregates by skip hopper or by belt conveyor.The small plant,like 25 m3/h,35 m3/h,and 50 m3/h,feeds aggregates by skip hopper.The big plant,whose capacity is higher than 60 m3/h, feed aggregates by belt conveyor.
There is an annular pipe for water or admixture feeding.
(we believe that water,admixture,cement & fly ash are also poured parallely while feeding material) The cycle time is 120 seconds
You can see that for every part we use very famous brand,the details is as follow: All motors of our plant: Siemens Brand Form Germany. Load cell: Mettler Toledo brand ,from USA Screw Conveyor: WAM brand form Italy Discharge Valve: WAM brand form Italy Air Cyliner: AIRTAC,NO.1 brand in Asia Electrical Component: Schneider Brand [...]
In general,it takes one weeks to istall the concrete batching plant.
The concrete shotcrete machine, we can use it directly when we receive it?
Wet shotcrete machine, machine larger, working less dust,smaller noise, environmental protection, spraying effect is better, save raw material.
Dry mix shotcrete machine: feeding dry raw material into the hopper Wet shotcrete machine, feeding wet raw material into the hopper. The same. final, spraying out wet concrete.
The dry shotcrete machine working: 1. feeding dry mixture of cement + sand + small stone (less than 20mm), into hopper 2. the machine is rotor structure to make the raw material into convey hose 3. the shotcrete machine, need one air compressor to supply air pressure. 4.the air pressure make the raw material through the [...]
The concrete shotcrete machine, we have electric drive type, diesel engine drive type, and air drive type for chioce.